Project Description
Dam Face Ballasting


SCOPE OF WORK
Fabricate Ballast Tubes & Install on Dam Face
PROJECT TYPE
Dam Face Ballast
MATERIAL USED
45 mil Reinforced Polypropylene
INDUSTRY
Mining
PROJECT LOCATION
AZ
PROJECT DESCRIPTION
Utilizing FLSI pre-fabricated ballast tubes to secure dam face liner to surface due to extremely high winds in the area. FLSI both fabricated the ballast tubes and also installed them for the client after FLSI completed the installation of the HDPE dam face liner.