Project Description

Dam Face Ballasting

0Ballast Tubes
PROJECT SIZE

SCOPE OF WORK

  • Fabricate Ballast Tubes & Install on Dam Face

PROJECT TYPE

  • Dam Face Ballast

MATERIAL USED

  • 45 mil Reinforced Polypropylene

INDUSTRY

  • Mining

PROJECT LOCATION

  • AZ

PROJECT DESCRIPTION

Utilizing FLSI pre-fabricated ballast tubes to secure dam face liner to surface due to extremely high winds in the area. FLSI both fabricated the ballast tubes and also installed them for the client after FLSI completed the installation of the HDPE dam face liner.